Resources

RV Cefas Endeavour 9/07

Cruise summary report

Cruise Info. 
Ship name (ship code)RV Cefas Endeavour (74E9)
Cruise identifier9/07
Cruise period2007-05-01 — 2007-05-03
StatusCompleted
Port of departureLowestoft, United Kingdom
Port of returnLowestoft, United Kingdom
PurposeResearch
ObjectivesAims

1. To recover and re-deploy SmartBuoy moorings at the West Gabbard and Warp and collect calibration samples (AE004).
2. To recover and re-deploy Waverider at Dowsing (C1828).

Narrative (all times GMT)

Sailed from Lowestoft on the evening tide Tuesday 1st May at 19:00 and proceeded to the Warp overnight. At 06:00 the next morning (2nd May), collected one water sample via Niskin sampler on the hydro wire and then recovered the SmartBuoy. Deployed a new SmartBuoy and took a further water sample. Steamed to the West Gabbard, arriving about 12:00 and collected a water sample before recovering the SmartBuoy. Deployed a new SmartBuoy and collected a post-deployment water sample. As all deployment and recovery operations had been carried out very efficiently, decided to take extra hourly water samples for calibration until 18:00. Proceeded to Dowsing Waverider site overnight, arriving at breakfast time on the 3rd May. Recovered, serviced and re-deployed the Waverider, finishing operations shortly before 10:00. Steamed back to Lowestoft, docking on the evening tide at 20:30.
Chief scientistDavid John Pearce (Centre for Environment, Fisheries and Aquaculture Science Lowestoft Laboratory)
ProjectAE004; C1828
Coordinating bodyCEFAS
Cruise programmeRV Cefas Endeavour 9/07 cruise programme endeavour9_07.pdf  (0.01 MB) 
Cruise reportRV Cefas Endeavour 9/07 cruise report endeavour9_07.pdf (0.01 MB) 
Ocean/sea areas 
GeneralNorth Sea
SpecificWest Gabbard, Warp and Dowsing