Objectives | Objectives
1. Obtain synoptic spring observations of the hydrography and the distributions of nutrients, phytoplankton and zooplankton along three sections on the Scotian Shelf and one in Cabot Strait, i.e. to carry out the Atlantic Zone Monitoring Programme (AZMP).
2. Retrieve and deploy moorings along a portion of the Halifax Line in the slope waters of the central Scotian Shelf and to take hydrographic profiles and collect water samples at mooring stations. This part of the programme was in collaboration with members of the UK RAPID-WAVE (West Atlantic Variability Experiment) programme.
Additional objectives
- Carry out hydrographic, chemical and biological sampling at stations in the Gully and Roseway Basin, on the Halifax Line Extension (to HL10), and at stations along transects across the NE Channel and St Anns Bank
- Collect nutrients and hydrography across the Northeast Channel as part of NERACOOS Cooperative Agreement
- Investigate the vertical distribution of macroplankton (e.g. krill) in NE Channel, the shelf basins, the Gully and Cabot Strait
- Deploy/recover moorings at inner shelf stations of the Halifax Section (OTN moorings)
- Deploy bottom mounted ADCP/microcat mooring and thermistor chain on St. Anns Bank
- Identify and enumerate birds during transit between stations and lines
- Collect and preserve water samples for analysis of carbon dioxide concentration
- Retrieve three 'whale listening' moorings in the Gully region
- Obtain some moving vessel profiler (MVP) transects during transits
All of the stations of the main AZMP lines were sampled, so that the first major objective, the core AZMP sampling, was successfully completed. All of the RAPID moorings on extended Halifax Section were recovered and deployed. The hydrographic and water sampling associated with the mooring programme were carried out, so that the second major objective was largely successfully completed. Additional stations were sampled as required by the additional objectives stated above and all objectives were achieved. |
---|
Chief scientist | David Hebert (University of Rhode Island Graduate School of Oceanography), Miguel Angel Morales Maqueda (National Oceanography Centre, Liverpool) |
---|
Project | RAPID-WAVE |
---|
Coordinating body | Natural Environment Research Council (NERC) |
---|
Cruise report | (1.17 MB) (4.55 MB) |
---|
Ocean/sea areas | |
General | North West Atlantic Ocean (limit 40W) |
---|
Specific | Continental slope southeast of Nova Scotia |
---|
Measurements | |
Physical oceanography | |
---|
CTD stations | Quantity: number of stations = 6 Description: CTD stations conducted with BIO Sea Bird instruments
Site HL8-RS5: 07/04/13, 3443 m depth, 42 22.03 N, 61 19.89 W
Site HL6.3-RS2: 09/04/13, 1650 m depth, 42 44.11 N, 61 37.41 W
Site HL7-RS4: 08/04/13, 2700 m depth, 42 32.08 N, 61 26.03 W
Site HL9-RS6: 07/04/13, 3700 m depth, 42 11.99 N, 61 09.95 W
Site HL6.7-RS3: 05/04/13, 2300 m depth, 42 37.05 N, 61 31.75 W
Site HL6-RS1: 09/04/13, 1032 m depth, 42 50.96 N, 61 43.58 W
For each of these stations, temperature,salinity and oxygen bottle samples were taken at suitable depths |
Moorings, landers, buoys | |
Physical oceanography | |
---|
Current profiler (eg ADCP) | 42° 15' 8" N 61° 38' 5" W — Site RS1: BPR (0 m above bottom)-ADCP (50 m) -CTD (100 m) mooring
recovered from 1106 m (unc.) , 05/04/13 |
Current profiler (eg ADCP) | 42° 10' 52" N 61° 0' 14" W — Site RS6: BPR (0 m)-ADCP (50 m)-CTD(100 m)-CTD (175 m) mooring
deployed in 3812 m (unc.) , 07/04/13, 20:15Z |
Current profiler (eg ADCP) | 42° 23' 49" N 61° 13' 21" W — Site RS5: BPR (0 m)-ADCP (50 m)-CTD (100 m)-CTD (175 m) mooring
deployed in 3440 m (unc.) , 08/04/13, 15:34Z |
Current profiler (eg ADCP) | 42° 33' 23" N 61° 22' 30" W — Site RS4: BPR (0 m) -ADCP (50 m)-CTD (100 m)-CTD (175 m) mooring
deployed in 2724 m (unc.) , 08/04/13, 18:55Z |
Current profiler (eg ADCP) | 42° 39' 21" N 61° 27' 29" W — Site RS3: BPR (0 m) -ADCP (50 m)-CTD (100 m)-CTD (175 m) mooring
deployed in 2280 m (unc.) , 08/04/13, 22:28Z |
Current profiler (eg ADCP) | 42° 44' 18" N 61° 34' 24" W — Site RS2: BPR (0 m) -ADCP (50 m) -CTD (100 m)-CTD (175 m) mooring
deployed in 1698 m (unc.) , 09/04/13, 14:14Z |
Current profiler (eg ADCP) | 42° 52' 6" N 61° 38' 1" W — Site RS1: BPR (0 m above bottom)-ADCP (50 m) -CTD (100 m)-CTD (175 m) mooring deployed in 1081 m (unc.) , 09/04/13, 11:29Z |
Current profiler (eg ADCP) | 42° 12' 20" N 61° 9' 10" W — Site RS6A: BPR (0 m). Recovered from 3873 m (unc), 07/04/13 |
Current profiler (eg ADCP) | 42° 10' 49" N 61° 0' 23" W — Site RS6: ADCP (50 m)-CTD (100, 600, 1200, 1700, 2300, 2900 m) mooring.
Recovered from 3836 m (unc), 07/04/13 |
Current profiler (eg ADCP) | 42° 23' 22" N 61° 16' 50" W — Site RS5: BPR (0 m)-ADCP (50 m) -CTD (100 m)mooring recovered from 3428 m (unc.) , 05/04/13 |
Current profiler (eg ADCP) | 42° 33' 25" N 61° 22' 15" W — Site RS4: BPR (0 m) -ADCP (50 m) -CTD (100 m) mooring deployed 2783 m (unc.) , 05/04/13 |
Current profiler (eg ADCP) | 42° 39' 21" N 61° 27' 23" W — Site RS3: BPR (0 m) -ADCP (50 m)-CTD (100 m) mooring recovered from 2325 m (unc.) , 05/04/13 |
Current profiler (eg ADCP) | 42° 44' 17" N 61° 34' 28" W — Site RS2: BPR (0 m above bottom)-ADCP (50 m) -CTD (100 m) mooring
recovered from 1718 m (unc.) , 05/04/13 |
Sea level (inc. bot. press., inverted echosounder) | 42° 44' 18" N 61° 34' 24" W — Site RS2: BPR (0 m) -ADCP (50 m) -CTD (100 m)-CTD (175 m) mooring
deployed in 1698 m (unc.) , 09/04/13, 14:14Z |
Sea level (inc. bot. press., inverted echosounder) | 42° 12' 20" N 61° 9' 10" W — Site RS6A: BPR (0 m). Recovered from 3873 m (unc), 07/04/13 |
Sea level (inc. bot. press., inverted echosounder) | 42° 44' 17" N 61° 34' 28" W — Site RS2: BPR (0 m above bottom)-ADCP (50 m) -CTD (100 m) mooring
recovered from 1718 m (unc.) , 05/04/13 |
Sea level (inc. bot. press., inverted echosounder) | 42° 15' 8" N 61° 38' 5" W — Site RS1: BPR (0 m above bottom)-ADCP (50 m) -CTD (100 m) mooring
recovered from 1106 m (unc.) , 05/04/13 |
Sea level (inc. bot. press., inverted echosounder) | 42° 52' 6" N 61° 38' 1" W — Site RS1: BPR (0 m above bottom)-ADCP (50 m) -CTD (100 m)-CTD (175 m) mooring deployed in 1081 m (unc.) , 09/04/13, 11:29Z |
Sea level (inc. bot. press., inverted echosounder) | 42° 39' 21" N 61° 27' 23" W — Site RS3: BPR (0 m) -ADCP (50 m)-CTD (100 m) mooring recovered from 2325 m (unc.) , 05/04/13 |
Sea level (inc. bot. press., inverted echosounder) | 42° 23' 49" N 61° 13' 21" W — Site RS5: BPR (0 m)-ADCP (50 m)-CTD (100 m)-CTD (175 m) mooring
deployed in 3440 m (unc.) , 08/04/13, 15:34Z |
Sea level (inc. bot. press., inverted echosounder) | 42° 33' 23" N 61° 22' 30" W — Site RS4: BPR (0 m) -ADCP (50 m)-CTD (100 m)-CTD (175 m) mooring
deployed in 2724 m (unc.) , 08/04/13, 18:55Z |
Sea level (inc. bot. press., inverted echosounder) | 42° 33' 25" N 61° 22' 15" W — Site RS4: BPR (0 m) -ADCP (50 m) -CTD (100 m) mooring deployed 2783 m (unc.) , 05/04/13 |
Sea level (inc. bot. press., inverted echosounder) | 42° 10' 52" N 61° 0' 14" W — Site RS6: BPR (0 m)-ADCP (50 m)-CTD(100 m)-CTD (175 m) mooring
deployed in 3812 m (unc.) , 07/04/13, 20:15Z |
Sea level (inc. bot. press., inverted echosounder) | 42° 10' 49" N 61° 0' 23" W — Site RS6: ADCP (50 m)-CTD (100, 600, 1200, 1700, 2300, 2900 m) mooring.
Recovered from 3836 m (unc), 07/04/13 |
Sea level (inc. bot. press., inverted echosounder) | 42° 23' 22" N 61° 16' 50" W — Site RS5: BPR (0 m)-ADCP (50 m) -CTD (100 m)mooring recovered from 3428 m (unc.) , 05/04/13 |
Sea level (inc. bot. press., inverted echosounder) | 42° 39' 21" N 61° 27' 29" W — Site RS3: BPR (0 m) -ADCP (50 m)-CTD (100 m)-CTD (175 m) mooring
deployed in 2280 m (unc.) , 08/04/13, 22:28Z |
Other physical oceanographic measurements | 42° 10' 52" N 61° 0' 14" W — Site RS6: BPR (0 m)-ADCP (50 m)-CTD(100 m)-CTD (175 m) mooring
deployed in 3812 m (unc.) , 07/04/13, 20:15Z |
Other physical oceanographic measurements | 42° 15' 8" N 61° 38' 5" W — Site RS1: BPR (0 m above bottom)-ADCP (50 m) -CTD (100 m) mooring
recovered from 1106 m (unc.) , 05/04/13 |
Other physical oceanographic measurements | 42° 44' 18" N 61° 34' 24" W — Site RS2: BPR (0 m) -ADCP (50 m) -CTD (100 m)-CTD (175 m) mooring
deployed in 1698 m (unc.) , 09/04/13, 14:14Z |
Other physical oceanographic measurements | 42° 44' 17" N 61° 34' 28" W — Site RS2: BPR (0 m above bottom)-ADCP (50 m) -CTD (100 m) mooring
recovered from 1718 m (unc.) , 05/04/13 |
Other physical oceanographic measurements | 42° 39' 21" N 61° 27' 23" W — Site RS3: BPR (0 m) -ADCP (50 m)-CTD (100 m) mooring recovered from 2325 m (unc.) , 05/04/13 |
Other physical oceanographic measurements | 42° 33' 25" N 61° 22' 15" W — Site RS4: BPR (0 m) -ADCP (50 m) -CTD (100 m) mooring deployed 2783 m (unc.) , 05/04/13 |
Other physical oceanographic measurements | 42° 52' 6" N 61° 38' 1" W — Site RS1: BPR (0 m above bottom)-ADCP (50 m) -CTD (100 m)-CTD (175 m) mooring deployed in 1081 m (unc.) , 09/04/13, 11:29Z |
Other physical oceanographic measurements | 42° 33' 23" N 61° 22' 30" W — Site RS4: BPR (0 m) -ADCP (50 m)-CTD (100 m)-CTD (175 m) mooring
deployed in 2724 m (unc.) , 08/04/13, 18:55Z |
Other physical oceanographic measurements | 42° 12' 20" N 61° 9' 10" W — Site RS6A: BPR (0 m). Recovered from 3873 m (unc), 07/04/13 |
Other physical oceanographic measurements | 42° 23' 49" N 61° 13' 21" W — Site RS5: BPR (0 m)-ADCP (50 m)-CTD (100 m)-CTD (175 m) mooring
deployed in 3440 m (unc.) , 08/04/13, 15:34Z |
Other physical oceanographic measurements | 42° 10' 49" N 61° 0' 23" W — Site RS6: ADCP (50 m)-CTD (100, 600, 1200, 1700, 2300, 2900 m) mooring.
Recovered from 3836 m (unc), 07/04/13 |
Other physical oceanographic measurements | 42° 39' 21" N 61° 27' 29" W — Site RS3: BPR (0 m) -ADCP (50 m)-CTD (100 m)-CTD (175 m) mooring
deployed in 2280 m (unc.) , 08/04/13, 22:28Z |
Other physical oceanographic measurements | 42° 23' 22" N 61° 16' 50" W — Site RS5: BPR (0 m)-ADCP (50 m) -CTD (100 m)mooring recovered from 3428 m (unc.) , 05/04/13 |